Pulling grip - Tradução em português
Installation generally begins at the probe end.
If the probe is elevated, position the reel at the base of the stack, if possible directly below the line where the bundle will be secured.
A draw cable can be fitted with split pulling grips (see Figs 2 and 3).
These grips are attached to the bundle at intervals of 35 feet maximum.
The cable and bundle are then pulled up to the level of the probe.
If the probe is elevated, position the reel at the base of the stack, if possible directly below the line where the bundle will be secured.
A draw cable can be fitted with split pulling grips (see Figs 2 and 3).
These grips are attached to the bundle at intervals of 35 feet maximum.
The cable and bundle are then pulled up to the level of the probe.
TESTE DE NÍVEL
2 respostas
Ordenar por: Data
ENTENDENDO AS HORAS EM INGLÊS